Mobile
Log In Sign Up
Home > chinese-english > "bottom of foundation" in English

English translation for "bottom of foundation"

地基底板
基础底板
基础底面


Related Translations:
baohui foundation:  报晖奖励基金会
nippon foundation:  日本财团
harriman foundation:  罗兰和格拉迪丝・哈里曼基金会
foundation cream:  粉底霜。
ford foundation:  福特基金会
steeped foundation:  阶形基础
box foundation:  浅基础箱形基础箱型基础箱形基椿箱形地基
foundation investigation:  地基查勘地基及基础研究地基勘察
gleitsman foundation:  格莱茨曼基金会
foundation folding:  基底褶皱
Example Sentences:
1.Concretely , for convenience , the heaved soils were excavated , and accordingly the character of soils in the bottom of foundation pit changed distinctly
目前为了施工方便而将基底回弹土体一并开挖从而使坑底土体的性状发生较大的改变,并最终导致上述现象的发生。
2.This paper focuses on a discussion of following issues through a combined of theoretical analysis and numerical calculation , and of theory - oriented , engineering analogy , experience and quantitative test . the stability analysis of slopes of deep foundation pit ; checking caculation of tensile breaking limiting condition of soil - nailing , grouting nail sheath anchored limit condition , rising of bottom of foundation pit and piping . measures are proposed for applying this method to slit stratification in disadvantage geologic
本文介绍了土钉支护技术的发展及作用机理,并结合工程实例,采用以理论为基础,重点研究探讨了土钉支护在深基坑边坡稳定分析、土钉抗拉断裂极限状态验算、整体稳定性验算、注浆钉包裹体锚固极限状态验算、基坑底隆起验算、抗管涌验算等方面设计计算方法,并提出了在其它不利地质环境中采用土钉支护应采取相应的措施。
3." prestress anchor ribbed beam support system " is a new practical support technology which came from soil nailing walls system and un - embedded rank of piles with anchors support system that has been used successfully for 4 years by the author and his company named qingdao deep foundation stabilization engineering co . , ltd . it " s mechanism is similar to rank of piles with anchors support system that can not be inserted into the bottom of foundation trench , but it " s ribbed beams are used to replace rank of piles made before excavation so the work cycle can be shortened and the support system cost can be reduced ; meanwhile this system maintains the soil nailing wall " s convenience of digging and supporting
“预应力锚杆肋梁支护技术”是笔者及所在单位历时四年在土钉墙和无嵌入多锚排桩两种支护体系基础上开发应用成功的一种新型实用性支护技术。其支护机理类似于未嵌入坑底的排桩多锚支护,只是由肋梁代替了开挖前施工的排桩从而提前工期并降低支护造价;同时继承了土钉墙随挖随支护的机动灵活性。自1998年至今该技术已在青岛、济南、烟台等十几个深基坑和高边坡工程中成功应用。
Similar Words:
"bottom of crank case" English translation, "bottom of deeper ocean" English translation, "bottom of duct" English translation, "bottom of external auditory canal" English translation, "bottom of flame" English translation, "bottom of hole" English translation, "bottom of legs leg opening" English translation, "bottom of lining fraying" English translation, "bottom of mantle" English translation, "bottom of notch" English translation